
Full Automatic Plastic Garbage Bag Making Machine Bag on Roll Machine Bottom Seal Bag Making Machine Double Fold V
- Overview
- Product Description
- Product Parameters
- Detailed Photos
- Company Profile
- Certifications
- Packaging & Shipping
- Exhibition
- FAQ
Basic Info.
| Model NO. | GBDR |
| Lines | 1 |
| Speed | High |
| Continuous-Rolled | Yes |
| Sealing & Cutting | Heat-Sealing Cold-Cutting |
| Layer | Double |
| Computerized | Computerized |
| Type | Plastic Bag Making Machine |
| Rewinder | Automatic or Semiautomatic, According to Your Need |
| Bag Making Methods | Fold-Fold, C-Fold |
| Temperature Controller | Made in Taiwan |
| Servo Motor | Made in Taiwan |
| Machine Inverter Brand | Made in Taiwan |
| Machine Control | PLC ,Touch Screen |
| Material | HDPE,LDPE |
| Loading | Two Air Cylinders |
| HS | 84778000 |
| Transport Package | Wrapping Film Packing or Packed in Wooden Case |
| Specification | CE, ISO9001: 2008, SGS, TUV |
| Trademark | SILSTAR |
| Origin | Jiangyin City Jiangsu Province |
| HS Code | 84778000 |
Packaging & Delivery
Package Size850.00cm * 150.00cm * 220.00cm Package Gross Weight3830.000kgProduct Description
Specializing in the production of table cover,bottom seal garbage bag, bottom seal S type wave top garbage bag, automatic paper label machine is avaliableOther kinds of bag making machine
Check out our range of high-quality bag making machinery! Our PE HDPE LDPE Bag Making Machinery is perfect for producing a variety of bags, including biodegradable, rolling, shopping, drawstring, and garbage bags. With our state-of-the-art plastic machinery, you can easily manufacture bags on rolls or in a production line. Explore our bag making equipment and join the bag manufacturing industry today!Other machine you may interested:
1.Film blowing machine2.Coreless Bag making machine 3.Bag with Core making machine4.Recycle machine 5.Interleave bag making machine
SILSTAR workshop pictures:
Product Description
The machine is specialized in producing flat bag with double fold / single fold bag on roll. 1. Automatic counting , PLC and screen controll. 2. Servo motor control speed and bag length. 3. Photoelectric eye track, automatic shutdown when the wrong mark. 4. It is suitable for all kinds of low density polyethylene plastic film (LDPE), high density polyethylene (HDPE) film bags, etc.. 5. Widely used in big garbage bag, common gorbage bag and pet gargage bag.Machine brand: SILSTAR
Product Parameters
Model | GBDR-700 | GBDR-1000 | GBDR-1200 |
Bag making width | 100-150mm | 100-250mm | 100-300mm |
Roller width | 600mm | 900mm | 1100mm |
Bag making length | 200-1500mm | 200-1500mm | 200-1500mm |
Bag making thickness | 0.008-0.03mm | 0.008-0.03mm | 0.008-0.03mm |
Bag making speed | 120m/min | ||
The kind of bag making | Color printing bags ; white bags | ||
Bag making methods | Double folded bag ;flat bottom seal bag | ||
Total power | 8kw | 10kw | 12kw |
Dimension of the machine | 5500*1400*1800mm | 5800*1600*1800mm | 5800*1800*1800mm |
Detailed Photos
Company Profile
Silstar machinery founded in 1997, covers an area of 32,000 m2,we focused on film blowing machine, bag making machines for plastic bag and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.
Certifications
Packaging & Shipping
Exhibition
FAQ
| 1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
| 2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
| 3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
| 4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
| 5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
| 6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
| 7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years of machine installation experience. |
| 8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
| 9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
| 10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |

